The project is located approximately 5 km north-east of Kondinin, in Western Australia’s Wheatbelt. The area has strong wind and solar resources and is close to existing electricity infrastructure and highway access.
Electricity generated by the project will flow through the nearby Kondinin substation into the Western Power network. The substation connects to the existing 220 kilovolt (kV) transmission line.
Stage 1 is the wind farm currently moving into delivery. Construction is expected to continue through 2027 and 2028, with completion anticipated in 2029.
The broader Kondinin Wind and Solar Project holds development approvals for up to 46 wind turbines providing 230 MW of wind capacity, around 60 MW of solar power, and battery energy storage.
These broader development components are separate from the Stage 1 construction scope. Future stages will require further consideration of technical, environmental, social and economic factors.